Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13600286

- Product Categories
- Friendly Links
Information Name: | Hunan parking spaces underground garage parking dash dash |
Published: | 2015-01-27 |
Validity: | 30 |
Specifications: | Hunan underground garage parking dash |
Quantity: | 850000.00 |
Price Description: | |
Detailed Product Description: | Ding far to undertake professional road marking, hot melt marking, hot melt marking, parking dash, factory crossed the road, parking dash, dash underground garage, school crossed the road, crossed the living area and other construction projects, Both crossed crossed into cold and hot melt paint. First, cold painted dash, the use of special road for cold paint, artificial spray, thickness, color and clear. Parking included, Jinting yellow line area, channel lines, with diversion, guiding arrows and so on. Second, a hot melt marking, reflective hot melt marking, using glass beads primer, petroleum resin hot melt coating. 2, the hot melt coating on the heating unit, after melting temperature controlled between 180 to 220 degrees Celsius, and stirred for about 10 minutes after coating. 3, the marker position and measured position and graphic icons prescribed according to the design, and then applying the drawing labeled primer paint. 4, can be carried out after the primer dry hot melt coating, coated marking while spreading reflective glass beads, increase nighttime visibility crossed underground parking garage construction process: 1. Select the location of the need to ensure the cleanliness of the construction location; 2. amount coordinate position, accurate positioning RBI. 3. play straight: straight sides taped delay; 4. Construction crossed extension rectilinear coordinate direction; 5. Subject line qualitative spaces after yer side positioning tape. 6. Minimum 10cm from parking on both sides of the column crossed 7. Masking posted compaction, confirmed the painting again, half an hour before exposing the tape, note that when painting should be uniform, vertical, ready at any time to clean up the leak. 8. adopted by the National Traffic Engineering Supervision Testing Center acrylic reasonable dedicated road marking paint, and a dedicated thinner, a 3: 1 ratio of deployment. Construction process to ensure uniform spray marking plan. Underground garage parking dash materials: 9. Strictly in accordance with regulatory requirements GB5768-1999 construction. 1, reflective hot melt marking, using glass beads primer, petroleum resin hot melt coating. 2, the hot melt coating on the heating unit, after melting temperature controlled between 180 to 220 degrees Celsius, and stirred for about 10 minutes after coating. 3, the marker position and measured position and graphic icons prescribed according to the design, and then applying the drawing labeled primer paint. 4, can be carried out after the primer dry hot melt coating, coated marking while spreading reflective glass beads, increase nighttime visibility, marking the thickness of 1.5- 1.8MM. |
Admin>>>
You are the 28325 visitor
Copyright © GuangDong ICP No. 10089450, Traffic Facilities Co., Ltd. Hunan tripod far All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 28325 visitor
Copyright © GuangDong ICP No. 10089450, Traffic Facilities Co., Ltd. Hunan tripod far All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility